Low Power St Cleanup
The city dug a hole under the Low Power St overpass, put up cones, and left. The same construction crew stood in that trench for 10 years and never fixed a thing. Even by government standards, that's impressive.
So I fixed it, because waiting on the city wasn't working.
- Pit filled and repaved into a full 4-lane road
- Barricades, cones and job site junk removed
- Bus stops and benches added
- Construction workers removed. They've been reassigned. Don't ask where.
- LOD and LOD lights fixed, so the pit doesn't come back at a distance
Escrowed. Drag, drop, ensure. Tested on build 3570.
Only $4. Cheaper than the city's budget for orange cones.
Built by a Vet. For the Community.